Third Mainland Bridge Repairs Completed

Lagos Mag
Lagos Mag  - Content Writer
3 Min Read

Third Mainland Bridge Repairs Completed

 

The Federal Controller of Works in Lagos, Mrs. Olukorede Kesha, on Sunday, expressed satisfaction with repairs done on the Third Mainland Bridge, assuring motorists of a smooth ride till the commencement of a comprehensive rehabilitation in January 2024.

Kesha gave the assurance on Sunday during an on-the-spot assessment of the repairs on the bridge.

 

The controller had, on Thursday, announced a 24-hour closure of the bridge to allow for repairs of some critical portions.

 

It was also reported that the closure took effect from midnight on Saturday till midnight on Sunday to reduce the hardship being faced by motorists. During the inspection, the controller stopped on various portions between Iyana-Oworo and Adeniji-Adele where remedial repairs had been done on a 9.7-kilometre stretch of the Lagos Island in-bound lane.

 

She stated that the construction done was just palliative work to keep the highway in good condition pending the comprehensive rehabilitation scheduled for January 2024.

 

“This repair is going to last beyond January; we don’t intend to do any work that will last only one or two months. Even by January, the road will still be good,” she said. Kesha said that some of the components needed for the comprehensive rehabilitation works were being imported for the emergency repairs to begin.

 

She added that what the Federal Ministry of Works had been doing before now was attending to failed portions, adding that the comprehensive rehabilitation would involve total removal and replacement of the asphalt surface.

 

The controller added that damaged ramps and expansion joints would be replaced, in addition to the painting of the parapet walls and other major repairs.

 

According to her, the contract awarded for comprehensive rehabilitation of the bridge in January would last for six months but would be divided into two segments of three months for each phase.

 

Kesha explained that the comprehensive repairs would give the infrastructure a new lease of life, after which the bridge would wear a new look.

Share this Article
17 Comments